PAR# |
Date recd |
Problem |
Person reporting |
Ind resp. |
Mgmt resp. |
Report due date |
PAR implem. Date |
Report complete |
PAR implemented |
Status |
comments |
Report |
|
|
|
|
|
|
|
1 |
3/3/2006 |
While putting slit orders there can be a human error where
wide coil |
J. Rowe |
J. Rowe |
J.Rowe |
3/7/2006 |
3/7/2006 |
|
|
closed |
|
|
finish will not match with slit finish |
|
|
|
|
|
|
|
|
|
|
|
|
7 |
4/6/2006 |
9
mill buttwelder must be replaced - it works borderline at best and on |
B. Miller |
B. Miller |
M. Watkins/ |
5/6/2006 |
6/6/2006 |
|
|
closed |
|
|
heavy gage does not work |
|
|
S. Capiotis |
|
|
|
|
|
|
|
|
|
|
9 |
3/23/2006 |
Slit order 18994 does not state if all slits or any slits
belong to 1800 |
Don Glass |
J. Rowe |
B. Hofmann |
3/31/2006 |
4/7/2006 |
Y (4/12/06) |
|
closed |
|
|
Need to clarify whether to skid or put in bins |
|
|
|
|
|
|
|
|
|
|
|
|
10 |
3/25/2006 |
Lack of end machine dedicated to 4 mill causing undue downtime |
BS (8188) |
R. Bishop |
M. Watkins |
5/24/2006 |
Now that we have retrofit reamer, we have |
|
|
closed |
|
|
fixing up machines from other mills |
|
|
|
dedicated wire brush reamers on each
mill. |
|
|
|
|
|
|
|
|
Need to ensure PM is performed on them |
|
|
|
|
|
|
|
|
|
|
|
|
11 |
3/25/2006 |
4 mill's 1.375" rolls are old and shot, giving ovality
problems |
BS (8188) |
B. Walters |
R. Bishop |
5/5/2006 |
1.375"
rd will be scheduled on M2 mills with |
|
|
closed |
|
|
|
|
|
|
better tooling |
|
|
|
|
|
|
|
|
|
|
|
|
12 |
3/25/2006 |
4 mill's 1.75"rd rolls are shot, ovality problems |
BS (8188) |
B. Walters |
R. Bishop |
5/5/2006 |
New rolls
expected 7/14 should solve this |
|
|
closed |
|
|
|
|
|
|
problem |
|
|
|
|
|
|
|
|
|
|
|
|
13 |
3/25/2006 |
4mill's 610 oval rolls not ground properly - concavity
problems - newset? |
BS (8188) |
B. Walters |
R. Bishop |
5/5/2006 |
Report recd
from Bruce. Short footage of |
|
|
closed |
|
|
|
|
|
|
100,000
ft per yr does not warrant purchase |
|
|
|
|
|
|
|
|
of new
rolls. Customer willing to take parts |
|
|
|
|
|
|
|
|
in current condition |
|
|
|
|
|
|
|
|
|
|
|
|
14 |
3/25/2006 |
Bench exhaust units need to be checked for proper flow. At any
time |
|
|
|
|
|
|
at any mill especially #1 mill , smoke billows out into the
dept. |
Fick (2297) |
B. Walters |
R. Bishop |
5/5/2006 |
Work order completed 7/12/06 |
|
|
closed |
|
|
Status: WO 29730
cleaning during shut down, currently in working condition |
|
|
|
|
|
|
|
|
|
|
|
|
15 |
3/25/2006 |
Floor at 1 mill has deep holes. We run 20" tubing and
balance it on one |
Joe Elacqua |
Leroy/Robin Bishop |
|
|
Floor was
cleaned and holes were patched |
|
|
closed |
|
|
|
fork.Bander takes chance balancing it. If the truck will hit
the hole, skid |
|
|
|
over shut
down. A quote to resurface area |
|
|
|
|
will fall. |
|
|
|
around cutoff and front of drop table is being |
|
|
|
|
|
|
|
|
pursued by Strat of
mtce. |
|
|
|
|
|
|
|
|
|
|
|
|
16 |
3/20/2006 |
Floor at #1 mill has deep holes. We run 20" tubing and
balance it on 1 |
Zimmerman/Fick |
R. Bishop |
Zimmer/Fick |
4/28/2006 |
|
4/28/2006 |
|
closed |
|
|
fork. |
|
|
Zimmerman/Fick to
stop the spills |
|
|
|
|
|
|
|
as floor was fixed last year. |
|
|
|
|
|
|
|
|
|
|
|
17 |
3/20/2006 |
Cover plate on ream#1 not attached properly |
Zimmerman/Fick |
R. Bishop |
R. Bishop |
4/28/2006 |
|
5/2/2006 |
|
closed |
|
|
|
|
|
Per Robin, mtce work
order |
|
|
|
18 |
3/25/2006 |
Payoff wheel very hard to turn at 4 mill. Could cause injury |
BS |
R. Bishop |
29717 was submitted and |
5/5/2006 |
|
5/2/2006 |
|
closed |
|
|
|
|
|
completed as of 4/26/06 |
|
Per Robin,
completed by Mtce without work |
|
|
|
19 |
3/30/2006 |
Bump marks in 1400 for item 1045676 |
Daniel Dougherty |
M. Watkins |
R. Bishop |
|
order on 4/17/06 |
|
|
closed |
|
|
|
|
|
Submit a mtce WO |
|
Per Mike, this was addressed with the crew |
|
|
|
20 |
3/30/2006 |
Bump marks in 1400 for item 1045676 |
Tom Wertz |
M. Watkins |
report by Mike sent to
Mike |
|
|
|
|
closed |
|
|
|
|
|
Krout to be given to
1400 |
|
Per Mike, this was addressed with the crew |
|
|
|
|
|
|
|
personnel |
|
|
|
|
|
21 |
3/30/2006 |
Bump marks in 1400 for item 1045676 |
Mike Julian |
M. Watkins |
report by Mike sent to
Mike |
|
|
|
|
closed |
|
|
|
|
|
Krout to be given to
1400 |
|
Per Mike, this was addressed with the crew |
|
|
|
22 |
3/30/2006 |
Lack of supervision on 1st shift at 1400 |
entire 2nd shift |
M. Watkins |
personnel |
|
|
|
|
closed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
report by Mike sent to
Mike |
|
Mike
Watkins to send a report to 2nd shift |
|
|
|
23 |
3/30/2006 |
Bump marks on 86488, mgmt continues to run line despite
problems |
Jan Pilat (5978) |
M. Watkins |
Krout to be given to
1400 |
|
employees |
|
|
closed |
|
|
|
|
|
|
personnel |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24 |
3/30/2006 |
Steel certification: Steel should be certified before it is
run on mills. If it is not |
S. Loos |
B. Hofmann/ |
report by Mike sent to
Mike |
5/15/2006 |
|
7/1/2006 |
7/1/2006 |
closed |
|
|
|
certified, then it should be tagged a suspect so shipping
knows that it cannot |
|
S. Benner |
Krout to be given to
1400 |
|
Robin
putting a code "NOC" for slits/coils |
|
|
|
|
|
be shipped. This could prevent shipping from accidentally
shipping an order |
|
|
personnel |
|
without
certs. Jim will not schedule this |
|
|
|
|
|
that needs mill certs for it. |
|
|
5/1/2006 |
|
steel for customers needing certs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
34 |
3/30/2006 |
Poor
management not enough people on 2nd shift to cover when |
Bill Frymoyer |
B. Miller |
|
|
|
|
|
closed |
|
|
someone is out |
2539 |
|
|
|
|
|
|
|
|
|
|
|
|
|
40 |
3/30/2006 |
Reamer and Swager rate sheet#3 new chart, parts are missing
now |
Charlie E. Carlisle |
J. Laidig |
Bob Miller
said jobs have been posted. |
|
|
|
|
closed |
|
|
|
(1062) |
|
We need to hire and train more people |
|
|
|
|
|
41 |
4/17/2006 |
700 mtgs to be held in west conference room as there are
interruptions |
Fick |
R. Bishop |
|
6/30/2006 |
|
Conference room will be used as |
|
closed |
|
|
in grind room |
|
|
John Laidig gave
new 1800 ream and |
|
6/30/2006 |
required, will have mtgs in grind room |
|
|
|
|
|
|
swage rate sheets to Charlie and also |
|
|
|
|
|
|
|
|
|
added rated.for over 85 cuts per min |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
42 |
4/17/2006 |
Quality statement sheets to be hung at time
clocks-restrooms-locker |
Fick |
M. Collur |
|
6/30/2006 |
|
More quality policy statements |
|
closed |
|
|
rooms |
|
|
|
6/30/2006 |
have been posted in lunchroom etc |
|
|
|
|
|
|
|
|
|
|
|
45 |
4/17/2006 |
Holes are punched with tabs bent over toward tap handle -
coating |
M. Krout (4328) |
Ralph J |
|
6/30/2006 |
|
7/1/2006 |
7/1/2006 |
closed |
|
|
Costing hooks do not seat properly - solution rotate punch to
have tabs |
|
|
|
6/30/2006 |
|
|
|
|
bend over to bottom (toward leg end) - item 1046796 |
|
|
|
|
|
|
|
|
|
|
Punch is changed |
|
|
|
|
|
47 |
5/5/2006 |
Scheduling dept puts short 2" diameter lengths on 4 mill.
The result is |
Mike Dunkle |
Bill H, Robin B |
|
6/15/2006 |
|
Lakewood item will
be recut going |
|
closed |
|
|
cut off jaws are damaged beyond repair. |
(1554) |
|
|
6/15/2006 |
forward. Routings changed. |
|
|
|
|
|
|
|
|
|
|
|
48 |
5/9/2006 |
Can bushes be trimmed along parking are by employment office |
Fick |
Not valid PAR |
|
|
|
|
|
closed |
|
|
|
|
|
|
|
|
|
|
|
50 |
5/12/2006 |
Powder
coating, Graco 85372, Fix source of problem in 1100, not in 1400, |
Dan Dougherty |
Ralph J/Mike K/Jay C |
|
6/15/2006 |
|
Jay provided a report |
|
closed |
|
|
makign 1400 employees do 1100 problem (grease on tube) |
(1547) |
|
|
6/15/2006 |
mfg/scheduling to
utilize report |
|
|
|
|
|
|
|
|
recommendations to
prevent |
|
|
|
|
|
|
|
|
this problem |
|
|
|
|
|
|
|
|
|
|
|
51 |
5/19/2006 |
Benington packaging: High quality tubes getting no paper, no
cardboard |
Edinger (1744) |
S. Gallagher |
|
6/15/2006 |
|
Steve G wrote a note saying |
|
closed |
|
|
on bottom, where the lift fork rubs against. |
|
|
|
|
6/15/2006 |
customer wants to try
it due to |
|
|
|
|
|
|
|
|
their automated shop as |
|
|
|
|
|
|
|
|
operators do not have
time to |
|
|
|
|
|
|
|
|
remove paper. |
|
|
|
|
|
|
|
|
|
|
80 |
8/14/2006 |
Somebody should check gage from beginning to end before we
accept slit steel |
H. Stamm |
M. Collur/ |
|
10/2/2006 |
|
Response given to
operators with |
|
closed |
|
|
from outside with special reference to SLS steel |
M. Schammauer |
B. Lamma |
|
|
10/2/2006 |
our Receiving
inspection procedure. |
|
|
|
|
|
|
|
|
Do not inspect
slit steel. Requested |
|
|
|
|
|
|
M. Collur/ |
|
|
B. Lamma to track supplier metrics/ |
|
|
|
|
|
|
B. Lamma |
|
rejects |
|
|
|
|
|
|
|
|
|
|
|
81 |
8/22/2006 |
Rust from drips and from sitting waiting for next process |
Chris Garber |
B. Hofmann/ |
|
9/30/2006 |
|
PAR report submitted to C. Garber |
|
closed |
|
|
Summo blanket order or stock order being run too soon. Order
sit for too long |
|
P. Sweigart |
|
|
9/30/2006 |
Back scheduled dates ok |
|
|
|
and sometimes under pipes that drip. Causing rust. Sometimes
rust is small |
|
|
|
|
Customer service
will maintain due |
|
|
|
spots. Solution: runs orders at mills only when needed/ The
less time between |
|
|
M. Collur |
|
dates, will not change dates once |
|
|
|
processes the better. |
|
|
|
product is produced off the mill |
|
|
|
|
|
|
|
|
|
|
|
|
82 |
8/22/2006 |
Tickets not correct. After process, no new ticket is made.
Tickets still read |
Chris Garber |
M. Collur/ |
|
9/30/2006 |
|
|
|
closed |
|
|
119.00
inches rather than finished length. Scratched out order # with no date |
|
B. Hess |
|
|
9/30/2006 |
|
|
|
|
or initials. |
|
|
|
|
|
|
|
|
|
|
M. Collur |
|
|
|
|
|
83 |
9/12/2006 |
Cost Saving: Instead of ordering new top rolls, send example.
2. 1000 2. .865 rolls |
David Breidigan |
R. Jeshoneck |
Ralph T. |
9/30/2006 |
2/21/2007 |
New roll is cheaper than ID |
|
closed |
|
|
to roll kraft and have I.D.s chromed. |
|
M. Watkins |
|
|
chroming |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|